RIBA Process

Every project follows a clear, defined path. You'll always know which stage you're in and what happens next.

Discuss Your Project

First, what does "RIBA chartered" actually mean?

Anyone can call themselves an architectural designer. The title "architect", and "RIBA chartered" alongside it, is protected. It means I've completed seven years of training, passed the professional exams, and work to the standards set by the Royal Institute of British Architects.

Not every firm offering drawings has it. It's worth knowing the difference before you hand over your project.

For you, it means a single qualified architect handling your project end to end, to a recognised professional standard, with the experience to anticipate the problems that catch unqualified designers out, and the accountability that comes with the title.

A clear path from first idea to finished building

Working to a professional standard also means working to a defined process. I follow the RIBA Plan of Work, the framework architects use across the UK, which breaks a project into clear stages so decisions are made in the right order and nothing happens by surprise.

It's a guide, not a fixed script. I shape each stage around your project and how involved you want to be. Here's what each one means in practice.

The RIBA Plan of Work stages, from strategic definition through to a building in use
The RIBA Plan of Work, simplified
0Stage

Strategic Definition

We work out what you actually want. Your priorities, your budget, and what a good result looks like. This usually happens before you commit, so it's also where you get a feel for how I work.

1Stage

Preparation and Brief

I turn those early conversations into a clear brief. We look at what's feasible and what the project needs, from sketch proposals and a cost appraisal to the approvals required and any consultants to bring in.

2Stage

Concept Design

Your ideas take shape on paper. I develop the initial concept so you can see and react to the layout and feel before we commit to detail. Once you're happy, we sign it off.

3Stage

Developed Design

The design firms up, with structure, services and budget all considered together. This is usually where the planning application goes in. For listed buildings or conservation areas, I'll prepare any extra documents needed, such as a Design and Access Statement.

4Stage

Technical Design

The design becomes buildable. I prepare the detailed drawings builders need to price the work accurately, bringing in specialists where required. Tendering usually happens here, so you can choose a contractor with confidence.

5Stage

Construction

Work starts on site. Ideally I administer the contract and oversee the build to completion, with regular site visits and constant reference back to the cost plan, keeping the project on programme and on budget.

6Stage

Handover and Close Out

The project completes. I see the contract through to the end, including sorting any snagging with the contractor and issuing the final certificate.

7Stage

In Use

Once you're in, I'm still on hand. This covers aftercare, from as-built drawings to advice on future alterations or additional work later on.